| Blueprint
2000 Projects: Tier One |
| Widening of Capital Circle
NW from I-10 to Blountstown Highway - (six
lanes from I-10 to Tennessee Street, four lanes from Tennessee
Street to Blountstown Hwy. and two interchanges); water resource
protection through greenway linkages and flood plain acquisition;
and protection of Gum Swamp system |
| Widening of Capital Circle
SE from Crawfordville Hwy to St. Augustine Road - partial
acquisition of Tram Road ROW for future transit; acquisition
of environmentally sensitive areas, and greenway connection
between St. Marks Trail and Southwood |
| Franklin Boulevard, Cascades
Park, Old St. Augustine Branch reconstruction - Reconstruction
of Franklin Blvd. and stormwater improvements; greenways and
trail development; acquisition of stormwater right of way
along St. Augustine Branch and Central Drainage ditch. |
Water Quality Program
Funding-Phase I - (includes
$10M for Frenchtown watershed drainage improvements and $5
M for County retrofit projects) |
| Eastern Leon County groundwater
and floodplain protection-Phase I - (420
acres approved for purchase via FCT grant, 25% local share
of $540,000 to be advance funded by County per action by IA
7/9/01 and County 7/10/01) |
| Lafayette Basin floodplain/greenway
land acquisition - for future
stormwater improvements and greenway connection from Lafayette
Heritage Trail to Miccosukee greenway |
| Widening of Capital Circle
SW from Blountstown Hwy. to Springhill Road - Right
of way acquisition and road construction; land acquisition
for future greenway. |
| Widening of Capital Circle
SW from Springhill Road to Crawfordville Road - Right
of way acquisition and road construction; land acquisition
for future greenway. |
Land acquisitions -
for greenway linkages between Maclay
Gardens, Timberlane Ravine, Goose Pond, and Tom Brown Park |
Old St. Augustine
Branch stormwater improvements - Gamble
Street to confluence with Munson Slough: Segment Four (Note:
Construction of Segment Four of the Capital Cascade Trail
was moved to Tier One on September 19, 2005 by action of the
Intergovernmental Agency.) |
Widening of Mahan Drive from Dempsey
Mayo Road to I-10 - Stormwater
improvements for roadway and Lake Lafayette; trail development
(Note: The widening of Mahan Drive was moved to Tier One on
June 4, 2007 by action of the Intergovernmental Agency.) |
Fred George and
Ochlocknee River Basins - Stormwater
improvements, groundwater protection, and greenway acquisition
(Note: Acquisition of several properties in the Fred George
Basin were moved to Tier One on June 4, 2007 by action of
the Intergovernmental Agency.)
|
| |
"B-list" Blueprint 2000
Projects (when funds become
available) |
Gaines
Street Reconstruction/Jackson Bluff Road extension -
(IA approved on 7/9 the design of Jackson
Bluff Road extension to be repaid from Blueprint 2000 funds) |
Airport
Gateway-Connector - from
Capital Circle SW to Lake Bradford Road |
| Eastern Leon County groundwater
and floodplain protection-Phase II |
| Meridian
Road intersection improvements and greenway connections -
Timberlane Ravine to Klapp-Phipps-Overstreet
Park |
| Water
quality program funding-Phase II |
Lake
Lafayette Basin - stormwater
improvements and floodplain protection |
Springhill
Road ROW and construction - stormwater
system and improvements from Springhill Road east to Indianhead
Acres; greenways/trail development |
Black
Swamp restoration - regional
stormwater pond, and Cascades to Munson Slough greenway trail
development |
Tram
Road ROW and construction -
interchange at Crawfordville Road |
| Roadway
improvements connecting Capital Circle SW and Springhill Road
- interchange at Orange Ave.
and Capital Circle SW |
| Service
Roads - Capital Circle NW |
| |
| City of Tallahassee Projects |
| Gaines Street Reconstruction |
| Elinor Klapp Phipps Soccer Complex
Improvements |
| Jack L. McLean, Jr. Park Recreation
Center and Pool |
| Lafayette Heritage Trail Facilities |
| A. J. Henry Park Recreation Center
and Pool |
| Ox Bottom Neighborhood Park Development |
| Unidentified Major Intersection Improvements |
| Tallahassee Junction Bikeway Trail
Head Development |
| Urban Corridor Project-Lake Bradford
Road Gateway Enhancement |
| Bronough and Duval Street Corridor
Enhancements (Tennessee to Tharpe) |
| Governor's Park Facility and Park
Enhancements |
| Springsax Sports Complex Enhancements |
| Greenway Connector Trails |
| Urban Corridor Project--North Monroe
Street Gateway Enhancement |
| Calhoun/Gadsden/Thomasville Road Operation
Study Improvements |
| Four Points Bikeway Trail Head Development |
| Urban Corridor Project--Tennessee
Street Gateway Enhancement |
| Urban Corridor Project--South Adams
Street Gateway Enhancement |
| Magnolia/Lafayette Street Improvements |
| Total projects to
be funded with 10% of sales tax revenues |
| |
| Extra City Projects
(when funds become available) |
| Greenway Connector Trails |
| Urban Corridor Project-Pensacola Street
Gateway |
| Alford Arm Regional Greenway Park |
| Total projects 20-22 |
| |
| Leon County Projects |
| Greenways, Parks and Recreation |
| Jackson View Park, Woodville
Community Park, Woodville Community Center, Alford Arm, Northeast
Community Park, Miccosukee Community Center, Miccosukee Greenways,
Lake Jackson Community Center, St. Mark’s Headwaters
Park and Apalachee Regional Park |
| Sewer System Projects |
| Centerville Trace Sewer
Project, Harbinwood Sewer Project and Woodville Sewer Project |
| Stormwater Projects |
Killearn Acres Flood
Mitigation |
| Lafayette Street reconstruction |
| Gadsden Street reconstruction (Gaines
to McDaniel) |
| Upper St. Marks Wetland preservation |
| Longwood Subdivision retrofit |
| Munson Slough improvements |
| Autumn Woods Way culvert improvement |
| Transportation Projects |
| Gaines Street reconstruction project |
| Meridian/Franklin (Franklin/Lafayette
to Gaines) |
| Lafayette Street reconstruction |
| Old St. Augustine Road reconstruction
(Blair Stone to Capital Circle) |
| Chaires Cross Road (US 27 north to
the RR crossing) |
| Intersection Improvements |
| Talpeco Road @ US 27 North |
| Crowder Road @ US 27 North |
| Tram Road @ Gaile Avenue |
| Bridges, Sidewalks, Bike Lanes,
Bike Paths |
| Bridges |
| Sidewalks |
| Bike Lanes |
| Bike Paths |
| Total projects to
be funded with 10% of sales tax revenues |
| |
| |
| Extra Leon County Projects (when
funds become available) |
| Bike Paths |
| Stormwater Projects |
| Harriett Drive reconstruction |
| Meridian Road |
| Crump Road Wetland construction |
| Jack Vause Road stabilization |
| Jefferson Road bridge |
| Miccosukee Road wetland construction |
| Baum Road (North) elevation |
| Moccasin Gap Road elevation |
| Buck Lake Road/Chaires Crossroads
storage ponds |
| Buck Lake Road |
| Old Bainbridge at Homewood |
| State Road 59 elevation and pond construction |
| Benjamin Chaires Road elevation |
| Baum Road (South) elevation |
| Transportation Projects |
| Old St. Augustine Road (Capital Circle
to Southwood Plantation) |
| Miccosukee Road (Capital Circle to
Edenfield) |
| Intersection Improvements |
| Miccosukee Road @ Capital Circle/Capital
Medical Drive |
| Miccosukee Road @ Fleishmann Road |
| Buck Lake Road @ Chaires Cross Road |
| Miccosukee Road @ Medical Blvd |
| Tharpe Street @ Colorado Street |
| Gadsden Street @ Pensacola Street |
| Tharpe Street @ Maryellen Street |
| Tharpe Street @ Trimble Street |
| |